  5. What should be paid attention to when installing warehouse mezzanine floor?

» What should be paid attention to when installing warehouse mezzanine floor?

Not all suitable products are obtained nearby. In many cases, things far away may bring different experiences? Just like the selection and installation of warehouse racks, we choose to let manufacturers thousands of miles away use the data we provide to customize a set of plans, which may be more appropriate than the plans provided by surrounding manufacturers.

Some people choose to buy warehouse racks nearby, but door-to-door installation is also a cost. The so-called wool comes from sheep, and some free installation manufacturers will also include this cost in the total price. Some users will choose to refuse this service in order to reduce certain fees. So, what should we pay attention to when installing this complex warehouse racking system?

1. The site is free of sundries.

Installing warehouse mezzanine floor takes time and energy. It is necessary to walk frequently for a long time. If there are some equipment easy to bump in the site, it will not only cause equipment loss, but also increase potential safety hazards.

2. Pre assign the circuit.

Some users want to install some lighting equipment or office equipment on the warehouse rack. It is recommended to reserve the circuit at the designated position before installation. After installation, the unnecessary circuits shall be reduced as much as possible to avoid increasing risks due to the complexity.

3. Prepare sufficient staff.

Most warehouse buildings use cold rolled iron parts. During installation, the workers shall first erect the column, and then conduct the subsequent installation of the beam. However, the connection between components is very loose when they are not connected in the early stage. Once a component fails, the whole newly built structure will collapse. Therefore, it is recommended that users install the warehouse racks together with sufficient personnel.

4. Tight connection.

The connection between components depends on the card slot and some external auxiliary parts. In order to stabilize the whole structure, the crossbeam shall be firmly fastened in the slot during connection. After the first floor is built, you must carefully check whether there are still any weak places. After confirming that each connection is stable, start to build the second layer, and finally add the partition.

5. Reserved passage.

During construction, some passages shall be reserved in the site. These passages can not only allow people to pass, but also, most importantly, allow transportation machines such as forklifts or elevators to pass unobstructed.